 Post subject: how long after concrete is poured can a house be moved on
PostPosted: Tue Oct 26, 2004 5:39 pm 

Joined: Tue Oct 26, 2004 5:30 pm
Posts: 1
We are moving an older home in great shape on to our new IntegraSpec basement (lower level). The workers poured the walls yesterday, October 25, 2004 and the floor was poured on October 15, 2004. How long do we have to wait before we can move the house on to this "lower level" to ensure we do not damage any of the work so far? The house is 2 story 26' X 52'


Top
   
 
 Post subject: Re: how long after concrete is poured can a house be moved o
PostPosted: Fri Oct 29, 2004 10:55 am 
Site Admin

Joined: Tue Jan 28, 2003 1:12 am
Posts: 10
Location: Ottawa, Ontario Canada
Catanzar wrote:
We are moving an older home in great shape on to our new IntegraSpec basement (lower level). The workers poured the walls yesterday, October 25, 2004 and the floor was poured on October 15, 2004. How long do we have to wait before we can move the house on to this "lower level" to ensure we do not damage any of the work so far? The house is 2 story 26' X 52'


Concrete according to tests, takes approx. 28 days to reach its full strenght from the time it was poured. At 7 days, concrete should be near its specified strength. Concrete also becomes stronger in an ICF according to industry tests, therefore, after 7 days, the closer to 28 days you wait, the better. Thanks


Top
   
 
 Post subject: Re: how long after concrete is poured can a house be moved o
PostPosted: Wed Nov 17, 2004 8:44 pm 

Joined: Sun Apr 20, 2003 12:42 pm
Posts: 3
Last year We poured on a Wednesday --lower floor-- & moved a modular on the next Tuesday & Wednesday. As I recall the concrete strength comes up very quickly in the initial 24 hours . We had no problems even though the 1/2 house at a time was concentrated on the two walls at four points plus two intermediate supports to the floor. Size was 14 x 28 times 2-- 1/2's




Michel Philippe wrote:
Catanzar wrote:
We are moving an older home in great shape on to our new IntegraSpec basement (lower level). The workers poured the walls yesterday, October 25, 2004 and the floor was poured on October 15, 2004. How long do we have to wait before we can move the house on to this "lower level" to ensure we do not damage any of the work so far? The house is 2 story 26' X 52'


Concrete according to tests, takes approx. 28 days to reach its full strenght from the time it was poured. At 7 days, concrete should be near its specified strength. Concrete also becomes stronger in an ICF according to industry tests, therefore, after 7 days, the closer to 28 days you wait, the better. Thanks


Top
   
 
Display posts from previous:  Sort by  
   [ 3 posts ] 

All times are UTC - 5 hours [ DST ]


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You can post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group
Translated by phpBB.fr © 2007, 2008 phpBB.fr
Vision Theme by Black Fusion © 2007 Frost